Licensed, bonded and insured  ·  Kaminskiy-certified technicians  ·  Workmanship warranty on every job
Kaminskiy Care + Repair Call 916-507-2190

SB 721 Balcony Repair in Roseville, CA.
Young Stock. Same Clock. Fixed Right.

Kaminskiy Care and Repair prices every finding on your SB 721 or SB 326 report, files the permit through Roseville's online portal and closes the repairs out for the re-inspection, from Highland Pointe Drive. No report yet? Our sister company, Kaminskiy Design & Remodeling, performs the inspection.

Technician holding a level against the new joists under a stucco apartment balcony
Before: an apartment balcony with rotted joists and a deck gone soft at the edgeAfter: the same balcony reframed, recoated and its guardrail re-anchored
Before: a deck with a loose guardrail post and weathered, split boardsAfter: the same deck with the post re-set, new boards and a sealed surface
Before: deck boards rotted through above a soft rim joistAfter: the same deck with a new rim joist and new boards, sealed
BEFOREAFTER
Your Roseville Balcony Repair Crew · Roseville
4.71,150 Google reviews
BBBBBBAccredited Business
10,000+Homes Cared For
Technician holding a level against the new joists under a stucco apartment balcony
Before: an apartment balcony with rotted joists and a deck gone soft at the edgeAfter: the same balcony reframed, recoated and its guardrail re-anchored
Before: a deck with a loose guardrail post and weathered, split boardsAfter: the same deck with the post re-set, new boards and a sealed surface
Before: deck boards rotted through above a soft rim joistAfter: the same deck with a new rim joist and new boards, sealed
BEFOREAFTER
Your Roseville Balcony Repair Crew · Roseville
THE SHORT ANSWER

Roseville's apartment stock is young by California standards, but the balcony law does not grade on age: every wood-framed balcony, deck, exterior stair and walkway more than six feet up on a rental building of three or more units was due for its first SB 721 inspection (Health and Safety Code 17973) by January 1, 2026, from the 1960s walk-ups off Vernon Street to the garden communities on Harding and Eureka and the podium buildings going up in West Roseville, and the reports are now coming back with findings. Those findings are the work of Kaminskiy Care and Repair (CSLB #1106209): from any licensed inspector's report we price each one on its own line, file the permit through the City's online portal inside the 120-day window, rebuild the joist ends, ledgers and stringers, replace the chalked coatings, re-anchor the rails and close the file for the re-inspection. If a rental building has no report yet, our sister company Kaminskiy Design & Remodeling, a B general building contractor since 2008 (CSLB #922807), performs the inspection under its own contract with you and signs the report inside 45 days. A condominium association under SB 326 brings us its engineer's report and we do the repairs it lists. The repair crew starts its day at our Roseville office on Highland Pointe Drive, a few minutes from Douglas Boulevard, the Galleria and Fiddyment Road.

★ Google 4.7 · 1,150 reviews●BBB Accredited●Best of Houzz●Union-Tribune Readers Poll●Kaminskiy-Certified Technicians●10,000+ Homes Cared For●Workmanship Warranty●21 Years of Kaminskiy●SB 721 & SB 326 Repairs, Old Town to Fiddyment Farm●
PRICE, PERMIT, REPAIR, CLOSE OUT

The repairs a Roseville report writes up,
done by the crew down the road

21 Years in Business Rental buildings, condos, breezeway stairs, walkways.
WHAT THE STATUTE ASKS OF A ROSEVILLE OWNER

Three obligations, and the one we take off your desk

Own a Roseville rental building with three or more units and Health and Safety Code 17973 asks three things of you: a qualified inspection of every balcony, deck, exterior stair and walkway that stands more than six feet above grade on wood framing, a written report kept in the building's file, and the repairs it lists finished inside the statute's deadlines. The third one is ours. Each finding gets its own written price, the permit goes in through the City's online portal with the report and the repair detail attached, and the crew from Highland Pointe Drive rebuilds the framing, replaces the coating across the whole deck, re-anchors the rails and documents every element for the re-inspection. For the first obligation, our sister company Kaminskiy Design & Remodeling holds the license class and the years the statute asks of an inspecting contractor.

Rental BuildingsCondo AssociationsBreezeway StairsCorridor WalkwaysDeck CoatingsGuardrails
Call About Your Project Get a Free Online Quote
★ REPAIRED, PERMITTED, DOCUMENTED
Stucco apartment balcony opened from below, the joists dark with rot and the deck saggingThe same balcony with new joists, a fresh waterproof coating and the guardrail re-setAFTERBEFORE
Rotted balcony joists exposed under an opened soffitJoists, Ledgers & Stringers
Rot cut back to sound wood; joist ends, ledgers, rim boards and stair stringers rebuilt in treated lumber with new hangers and flashing.Get it scheduled
Technician rolling a waterproof coating across an apartment balcony deckCoatings & Flashing
A coating that chalked through valley summers stripped and replaced with a new membrane, slope and drip edge so the winter rain leaves the deck instead of entering the wall.Get it scheduled
A wobbling wood guardrail post and split deck boards before repairGuardrails & Handrails
Posts re-anchored into solid framing, rusted brackets replaced, rails brought to the 42-inch height the City's deck handout asks for.Get it scheduled
Technician showing a couple the rotted base of an exterior stair postBreezeway Stairs & Walkways
The open stairs and second-floor corridors that serve every unit in a garden community are elevated elements too, with the most traffic and the most to count.Get it scheduled
A failed deck guardrail and soft boards awaiting shoringImmediate-Threat Shoring
An element the inspector tags unsafe is closed to tenants and shored the same visit, reported to the Building Division within 15 days, and repaired ahead of everything else.Get it scheduled
Technician reviewing the inspection report and the online permit filing for a Roseville garden community, clipboard in handThe Permit on the City Portal
Roseville takes every application online, with the inspection report and the repair detail attached; a rebuilt cantilever or a changed guardrail follows the City's raised-deck checklist with plans and calculations. We file inside the 120 days, with Sacramento, Rocklin, Folsom and Placer County permits going to their own counters.Get it scheduled
Technician shaking hands with a building owner in the courtyard after the balcony workClose-out & Re-inspection
Final photographs of every repaired element, the permit signed off, and the file a lender, an insurer or the next buyer will ask to see.Get it scheduled
Kaminskiy Design & Remodeling inspector reading the framing under a Roseville apartment balcony with a moisture meterRental Building Not Inspected Yet?
Through our sister company Kaminskiy Design & Remodeling (CSLB #922807, a B general building contractor since 2008): the element types counted, a 15 percent sample of each examined, the photographed report signed inside 45 days, contracted with you directly and booked through our Roseville office.Get it scheduled
WHAT STARTS THE CLOCK

The reports and the warning signs
Roseville owners call about

Call 916-507-2190
The report is back, it lists findings, and the 120-day permit window started the day it landed in your inbox.
Your lender, your insurer or a buyer's escrow wants the findings repaired and the permit closed before the file moves.
The coating on the west-facing balconies has chalked and split after another run of days above 100.
A breezeway stair in a garden community flexes at the bottom tread, right where the sprinklers wet the stringer every night.
A second-floor corridor rail gives when a tenant sets a hand on it.
No SB 721 report in the file for the rental building, and the January 1, 2026 date behind you.

Each of these is a building the crew from Highland Pointe Drive can walk within days. A report with findings gets a line-by-line price and a permit filing inside the statute's windows, an element tagged an immediate threat is closed and shored before anything else is scheduled, and a rental building with no report yet gets the inspection booked with our sister company.

HOW IT WORKS

From the report to a closed-out building
in three moves

Kaminskiy team member answering a call
01
Send the report and the address

Text or email the SB 721 or SB 326 report. No report yet on a rental building? Send the address and a unit count and we arrange the inspection with Kaminskiy Design & Remodeling.

Clear written quote
02
Price and permit

Each finding priced on its own line after a site walk, the permit filed through the City's portal inside 120 days with the report attached, and an immediate threat closed and shored first.

Kaminskiy technician greeting a client at the door
03
Repairs closed out

Framing, coatings, stairs and rails rebuilt inside the permit window, every element photographed, the permit signed off and the close-out file ready for the re-inspection.

The Kaminskiy Guarantee

Every job is backed in writing by our workmanship warranty and done by a Kaminskiy-certified, background checked technician.

Workmanship warrantyLicensed, bonded & insuredKaminskiy-certified techniciansBackground checked crews

Buildings closed out.
Owners who called back.

4.7 of 5 · 1,150 Google reviews
★★★★★
Wow! What a great experience from first contact until work completion. Scheduler was super friendly and quote was very detailed in exactly what would be done and an estimate of cost. This was different from other quotes we got which were just random numbers...Shannon Cate · Google, 2 weeks ago
★★★★★
Facundo showed up on time, was professional, and took the time to thoroughly inspect the issue. After a detailed assessment, he was upfront and honest that the damage was beyond repair rather than suggesting unnecessary work. It’s refreshing to come across...Fernando Zyserman · Google, 2 weeks ago
★★★★★
Harvin was honest, personable, and very customer-friendly from start to finish. The work he completed was clean, and he had a great attitude and was more than willing to accommodate my repair needs. You can tell he takes pride in his work and genuinely care...Brian Jackson · Google, 3 weeks ago
★★★★★
David fixed our French doors so that they lock securely as they should. He was on time, friendly, professional and he did a great job! We are very pleased.Sonia Alvarez · Google, 3 weeks ago
★★★★★
I’m a pretty handy guy, having been a jet mechanic and lifelong DIYer, but when my dog broke the rear hanger on my pocket door, I couldn’t figure out how to remove it. Ivan arrived on time, quickly removed the door, and even took the time to show me how he...Mike Batesole · Google, a month ago
READING THE INSPECTION

What the report is telling you
about a Roseville building

Reading the findings

A Roseville report usually points at the same wood: the joists that cantilever the balcony out of the wall, the ledger bolted to the building, the rim board the guardrail posts hang from, the stringers under the breezeway stairs. The lines read as elevated moisture at the ledger, deterioration at the joist ends, a stringer foot soft at the landing, a coating chalked through, an anchor without sound wood behind it. Each one is a repair we price on its own line, and the service-life column decides the order: whatever the inspector gave a year or two is rebuilt first.

SB 721 or SB 326

A rental building with three or more units is under SB 721 (Health and Safety Code 17973): first inspection due January 1, 2026, then every six years, by one of the four inspector types the section names. A condominium project with three or more units, such as the Roseville Greens buildings on Harding or a Sunrise Avenue condo association, is under SB 326 (Civil Code 5551): first inspection due January 1, 2025, then every nine years, by a licensed structural or civil engineer or an architect. A single-family community like Sun City Roseville is outside both laws.

The two 120-day windows

An element the inspector marks an immediate threat is closed to tenants at once, shored where it needs it, and reported to the City's Building Division within 15 days. Every other finding runs on two windows: the permit application within 120 days of the report, and the repairs within 120 days of the permit. If the work is still open 180 days after the report the inspector tells the City, a 30-day notice follows, and after that the daily penalty runs until the building is fixed.

Repair, or rebuild from the ledger out

Rot confined to a joist end, a post base or the bottom of a stringer is cut back to clean wood and sistered or replaced. Rot that has crossed the ledger or taken most of the joists means the balcony or landing comes off and is rebuilt from the framing out. In either case the coating goes back across the whole surface, because a patch in a chalked membrane is the next leak, and the re-inspection expects a finished deck, not a repaired corner.

ROSEVILLE, CA

Roseville's balcony repairs,
ring by ring

Roseville grew in rings. The railroad town around Vernon Street and Old Town came first, the I-80 side filled in after 1956 with the garden apartments of Harding, Cirby and Douglas, the Galleria pulled a 2000s wave onto Roseville Parkway and Gibson Drive, and the villages west of Fiddyment Road are still being built, many of them with the podium and wrap buildings that put an owner on the certificate-of-occupancy clock. About a third of the city's households rent. Which ring your building sits in decides what the report finds and what the repair looks like.

THE OLD GRID AND THE HARDING CORRIDOR

Historic Old Town, Vernon Street, Cirby Way, Harding Boulevard, Douglas Boulevard, Sunrise Avenue

The 1960s and 1970s walk-ups and fourplexes near the center and the condominium buildings of the Roseville Greens era, with open wood stairs, exterior landings and balconies cantilevered over the carports. Fifty summers of valley sun have cooked the original coatings and fifty wet seasons have followed the cracks into the ledger. The common finding is a stair stringer gone soft at the landing, a post base rotted where the planter meets it, and joist ends dark behind stucco that still looks fine from the parking lot. The condo associations here are under SB 326 and bring us their engineer's report; the rentals are under SB 721 and we inspect them.

THE 1980S TO 2010S GARDEN COMMUNITIES

Eureka Road, Rocky Ridge, Oak Ridge, the Galleria, Roseville Parkway, Gibson Drive, Secret Ravine Parkway

Two- and three-story stucco buildings around pools and breezeways, with second-floor corridor walkways and open stairs serving every door. These have the most elements to count and the most feet on them, so the inspection is scheduled around tenant access and done building by building. Landscape irrigation soaks the stair bases and the walkway edges every night of a dry summer, scuppers clog with oak litter and pond the winter rain on the coating, and the west-facing balconies chalk through their membrane after enough days above 100. The repair is usually stringer bottoms, post bases, a re-sloped and recoated walkway and rails re-anchored into new wood.

WEST ROSEVILLE AND THE NEW CLOCK

Fiddyment Farm, WestPark, Sierra Vista, Blue Oaks, Pleasant Grove, Hayden Parkway, Pacific Street downtown

Wood-frame floors over concrete podiums, wrap buildings around parking structures and 2020s garden communities with balconies on a liquid-applied membrane. The framing is young, so the findings are at the details: a slider threshold flashed short, a sealant joint opened by a summer of 105-degree afternoons, a drain that ponds water against the stucco. A building permitted on or after January 1, 2019 is inspected within six years of its certificate of occupancy rather than by the 2026 date, and much of this stock is inside that window. The condominium flats and townhome associations here are under SB 326; the rental buildings are under SB 721. Sun City Roseville's houses are single-family and under neither.

KNOW YOUR HOUSE

The four things
a Roseville owner asks first

Which law covers the building

Count the units and check how they are held. Three or more rental units in one building puts it under SB 721: the first inspection was due January 1, 2026 and the cycle is six years. A condominium project of three or more units is under SB 326 instead: due January 1, 2025, a nine-year cycle, and a licensed structural or civil engineer or an architect does the inspecting. A building whose permit was issued on or after January 1, 2019 is inspected within six years of its certificate of occupancy. A duplex is under neither, nor is a single-family 55-plus street, though the same water does the same damage. Send the address and we settle it on the call.

What the repairs involve

Each finding is opened at the soffit or from the breezeway below, the rot cut back to sound wood, and the joist end, ledger, rim board or stringer rebuilt in treated lumber with new hangers and flashing. A chalked coating is stripped and replaced across the whole deck or landing with a new membrane, slope and drip edge, so the winter rain leaves the deck instead of entering the wall; a patch is where the next tide line starts. Posts are re-anchored into solid framing, rusted brackets replaced, and rails brought to the 42-inch height the City's deck handout asks for. Every element is photographed and numbered before, during and after, and the photographs become the close-out file.

Who repairs, and who may inspect

Health and Safety Code 17973 lists who may sign an SB 721 report: architects and civil or structural engineers with a California license, general contractors who have held an A, B or C-5 license for five years and built multistory wood-frame buildings under it, and certified building inspectors or building officials, none of them on the City's staff for the job. It then sends the repairs to a qualified, licensed contractor who follows the report, the state code and the City's rules. In Roseville that repair contractor is Kaminskiy Care and Repair (CSLB #1106209), and the report can come from anyone on the list. When a rental building has no report yet, our sister company Kaminskiy Design & Remodeling (CSLB #922807, a B general building contractor since 2008) writes it under its own contract with you.

How the price works

Repairs are priced from the report, finding by finding: a sistered stringer is one line, a recoated walkway is another, a balcony rebuilt from the ledger out with a new guardrail is a longer one. You read every line before anything is booked, and the report is yours to bid elsewhere if you choose. The SB 721 inspection, when a rental building still needs one, is one flat figure from Kaminskiy Design & Remodeling, set from the number of elements, the number of types and whether the framing is open underneath or closed in by stucco, and confirmed in writing before a date is set.

HOW IT RUNS

The report, the permit
and the repairs, in order

01The report and the address

The findings and the service-life column tell us where to start; we confirm the law and set the site walk. A rental building with no report yet gets the inspection booked with our sister company, and the repair side begins when the report is signed.

02The site walk

Notice to tenants first. Each finding is examined from the walking surface and from below, enclosed framing is metered or opened at the soffit, and the scope is written line by line against the report's numbering.

03The permit, inside 120 days

Filed through Roseville's Online Permitting Services with the report and the repair detail attached, plans and calculations where a cantilever is rebuilt or a guardrail changed, the right counter for a Sacramento, Rocklin, Folsom or Placer County address, and shoring first wherever an element is an immediate threat.

04The repairs and the close-out

The work inside the permit window, every element photographed, the permit signed off, and the close-out file for the re-inspection, the lender and the next buyer.

Four jobs go to other licensed hands, and we say so on the call. The SB 721 report itself is written by our sister company Kaminskiy Design & Remodeling under its own license. An SB 326 report on a condominium project can only come from a licensed structural or civil engineer or an architect. A cantilever that has to be re-engineered rather than repaired in kind gets a licensed engineer's structural engineering design. Live termite colonies in the framing go to a licensed pest control company for termite treatment before we rebuild, and an older deck coating that tests positive for asbestos goes to a licensed abatement contractor first. We build around all four and keep the carpentry, the coatings and the railings.
THE RULES

What Roseville apartment owners
want to know about the law

The statute on inspectors and repair contractors

Health and Safety Code 17973(a) names the inspectors the law accepts: a licensed architect, a licensed civil or structural engineer, a general contractor with an A, B or C-5 license and five years as a license holder in multistory wood-frame construction, or a certified building inspector. Subdivision (g) does not bar the inspector's group from the repairs; it requires that a qualified and licensed contractor do them, following the inspector's recommendations, the Building Standards Code and the City's requirements. The owner contracts the inspection directly with the inspecting company, as the statute requires. In Roseville that is Kaminskiy Design & Remodeling, booked through our Highland Pointe Drive office, with the repairs under a separate contract with Kaminskiy Care and Repair, so the report stands on its own wherever you take it.

Permits and the City

The local enforcement agency for a Roseville building is the City's Development Services Department, Building Division, at 311 Vernon Street. Every permit application goes in through the City's Online Permitting Services portal; there is no paper route, and the quick permits the City once issued at the counter are limited to water heaters, HVAC, panels and reroofs on one- and two-family houses. The City's own handout puts a deck attached to the building and termite damage repair on the permit list, so a balcony, stair or walkway repair that touches framing, a ledger, a guardrail or the waterproofing is filed as a building permit with the inspection report and the repair detail attached, and a rebuilt cantilever or a changed guardrail follows the City's raised-deck checklist with plans and calculations. Roseville publishes no separate SB 721 page or portal; the report stays in your records, and an element tagged an immediate threat is reported to the Building Division within 15 days. A Sacramento building answers to the City of Sacramento's Community Development Department, Building Division, on Richards Boulevard; Rocklin, Citrus Heights and Folsom have their own building divisions; a Granite Bay or Loomis address is unincorporated and goes to Placer County's Building Services Division in Auburn.

Deadlines and penalties

The first SB 721 inspection was due January 1, 2026, a year later than the statute first said after AB 2579 passed in 2024, and the cycle is six years from there; a building permitted on or after January 1, 2019 is inspected within six years of its certificate of occupancy instead. Once a report lists repairs, the permit application is due within 120 days and the work within 120 days of the permit. Repairs still open 180 days after the report bring a notice from the inspector to the City and a 30-day notice to the owner, after which a civil penalty of one hundred to five hundred dollars per day runs until the work is done, with a building safety lien available to the City behind it. Reports are kept for two inspection cycles and handed to the buyer when the building sells.

WHO CALLS

Who calls us about
SB 721 in Roseville

Apartment ownersA fourplex off Vernon Street or a two-hundred-unit garden community on Eureka Road: every finding on the report priced, permitted and repaired by one crew from Highland Pointe Drive, with our sister company for the inspection when there is no report yet.
Property managersPortfolios across Roseville, Rocklin, Citrus Heights and Sacramento repaired on one schedule, tenant notices written for you, every element numbered and photographed for the owner's file.
Condo and townhome boardsSB 326 repairs priced line by line from the engineer's report, building by building so residents keep their stairs, and written up for the reserve study.
Buyers, sellers and lendersThe report a Roseville sale now has to disclose, and the repairs that let the escrow or the refinance close on its date.

Minutes from Douglas, the Galleria and Fiddyment. Our Roseville office on Highland Pointe Drive is where the repair crew starts the day, so a Roseville report with findings gets its site walk within days and a Sacramento or Folsom building the same week. Call 916-507-2190, text a photo of the report or the balcony, or send the form.

OUR ROSEVILLE OFFICE916-507-2190915 Highland Pointe Dr, Suite 250-C, Roseville, CA 95678
Mon to Fri 8 to 6:30, Sat and Sun 9 to 6:30
Roseville handyman services
GOOD QUESTIONS

SB 721 in Roseville,
question by question

Can't find your answer? Call 916-507-2190 and ask us anything.

Call 916-507-2190

Email or text it with the address. A site walk checks each finding at the building, every one gets its own written price, and the permit application goes through Roseville's online portal with the report and the repair detail attached, inside the statute's first 120-day window. The work runs inside the second window, 120 days from the permit, any immediate-threat element is closed and shored ahead of the rest, and the close-out file carries a photograph of every repaired element for the re-inspection.

Yes. Nothing in the statute ties the repairs to the person who signed the report; it asks for a qualified, licensed contractor following the inspector's recommendations. Our written scope keeps the report's numbering so the City, the lender and the board can read the two together.

Finding by finding from the report, in writing, before a date is set: a sistered stringer is one line, a recoated walkway is another, a balcony rebuilt from the ledger out with a new guardrail is a longer one. Call 916-507-2190 with the report and the address and the written scope follows the site walk.

Through our sister company. Kaminskiy Design & Remodeling (CSLB #922807) has held its B general building license since 2008, the class and the years the statute asks of a contractor who inspects. It contracts with you directly, counts the element types on the building, samples at least 15 percent of each and signs the photographed report inside 45 days. Kaminskiy Care and Repair (CSLB #1106209) takes the repair contract from there. Both are booked through the Highland Pointe Drive office, 916-507-2190.

Two companies in one group do it. Kaminskiy Design & Remodeling inspects and signs the report under its own contract with you; Kaminskiy Care and Repair contracts the repairs separately. The statute asks that a qualified and licensed contractor do the repairs to the inspector's recommendations and the building code, and says nothing against the inspecting company's group being that contractor. Because every finding carries a photograph and a description, the report is usable on its own and you may bid the repairs to anyone you like.

Book the inspection and keep the booking confirmation. The daily penalty in the statute attaches to repairs left undone after a report, not to a late first inspection, and the Building Division has no reason to pursue an owner who can show a scheduled date. If the inspection finds an immediate threat, that element is closed and shored on the visit and reported to the City within 15 days; every other finding goes onto the ordinary 120-day permit clock.

In a condominium project the association is responsible for the SB 326 inspection and, under most CC&Rs, for repairing the load-bearing framing and the waterproofing it maintains as common area, with exclusive-use balconies divided as the governing documents say. The inspection itself must be done by a licensed structural or civil engineer or an architect. A Roseville board hands us that report and we price and complete the repairs, phased so residents keep their stairs and walkways, and documented for the reserve study.

It is the inspection California requires every six years of the exterior elevated elements on a rental building with three or more units: the balconies, decks, porches, stairways, walkways and entry structures that stand more than six feet above the ground and depend on wood framing, with their guardrails and waterproofing. A qualified inspector identifies each element type, examines at least 15 percent of each, and signs a written report with photographs within 45 days. The first inspection was due January 1, 2026.

RATHER TYPE THAN TALK?

Get the repairs on your report priced

Send the address and attach the report if you have one. No report yet on a rental building? Say so and the inspection gets booked. You hear back with a scope and a date; the phone is quicker, 916-507-2190.

Priced & scheduled in under 10 minutes
Free quote, no obligation
Agree

By providing your number and clicking on "Submit", you agree to be contacted by Kaminskiy Care & Repair about your project via phone, email, and text messages, including marketing messages about special offers, discounts, and promotions. Consent is not a condition of purchase. Message and data rates may apply. You can unsubscribe at any time by replying STOP. For help, reply HELP. Message frequency will vary.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

LOCATIONS

SB 721 repairs and inspections
from Roseville across the region

See All Locations

Ready to get the findings fixed and the file closed?

Every repair on the report, permitted through the City portal and closed out, from the Kaminskiy crew on Highland Pointe Drive. No report yet? Our sister company performs the inspection.

Call 916-507-2190 Get a Free Online Quote
We answer in under three rings, 24/7.
Call Now Text